Water/Environment Best Project Able Pump No. 3

September 29, 2020

Featuring a modern design and the largest concrete pumps of their kind, the $68.6-million Able Pump Station No. 3 has brought improved flood control to a 2,685-acre area near the Dallas business district.

Previous Article
Small Project (under $10 million) Award of Merit All Saints Church Renovation
Small Project (under $10 million) Award of Merit All Saints Church Renovation

Innovative problem-solving was essential to converting an 88-year-old former car dealership in downtown Dal...

Next Article
Water/Environment Award of Merit Columbia Lock and Dam Emergency Seepage Repairs
Water/Environment Award of Merit Columbia Lock and Dam Emergency Seepage Repairs

After the U.S. Army Corps of Engineers called for the emergency closure and repair of the Columbia lock and...